Wuhan SY Blue Sky Environmental Technology Engineering Co., Ltd.
Wuhan SY Blue Sky Unveils Innovative Technologies at Shanghai WIPG 2025 for the Green Energy Event
Release time:2025-12-12
Wuhan SY Blue Environment Technology Engineering Co., Ltd., with "high efficiency, green and intelligent" as the core theme, brings systematic solutions to the industry's annual grand meeting, focuses on "waste free city" construction and high-quality development of waste incineration power generation, and carries out in-depth communication and docking with guests from owners, design institutes, engineering companies and scientific research institutions.
Exhibition Information
Name of exhibition: The 7th Shanghai Waste Incineration & Power Generation Exhibition (WIPG Expo 2025)
Exhibition period: December 11-13, 2025
Location: Shanghai New International Expo Center
Booth No. : K108
Sponsored by: Waste-to-Energy Committee of All-China Environment Federation (ACEF)
Supported by: National Engineering Laboratory for Municipal Solid Waste Incineration Technology and Equipment
Organizer: Shanghai Yihan Exhibition Service Co., Ltd
Field direct-fighting and cutting-edge technology gaining high attention
The booth is presented as "technical main line+scene demonstration", with clear plates and strong interactivity, attracting a large number of industry customers, potential partners and experts for exchange.
Key exhibition directions:
Efficient clean incineration and plant-wide collaborative optimization: combustion optimization, SNCR/SCR coupling, heating surface corrosion prevention and control, boiler stability improvement.
Ultra-low emission offgas purification: multi-pollutant collaborative treatment, low-temperature SCR, deep denitration, high-efficiency dust removal, dioxin control and online warning.
Fly ash stabilization and recycling: comparison between heavy metal stabilization agent system and solidification/melting route.
Multi-component solid waste collaborative treatment and SRF: dry sludge/general industrial solid waste and domestic waste co-combustion, SRF preparation and application scenarios.
Smart digital solution: DCS/PLC+edge computing, digital twin, AI combustion optimization, CEMS linkage and intelligent early warning, operation&maintenance board and performance benchmarking.
The technical expert team provides one-to-one technical consultation on site, carries out in-depth communication around the pain points of the project, the latest environmental protection policies and future trends, and obtains valuable feedback and substantial cooperation intention
Core Presentation Explains Comprehensive Strength
Full chain capacity of waste incineration power generation: provide systematic design and project implementation capacity from waste receiving and pretreatment, grab and feeding, grate furnace/fluidized bed incineration, waste heat boiler and turbine island, flue gas purification, leachate treatment, fly ash treatment to electrical automatic control and intelligent operation and maintenance.
Systematical service capacity: covering the whole life cycle services such as EPC of new projects, quality and efficiency improvement and transformation of stock plants, maintenance, operation, maintenance and trusteeship, and third-party technical services.
Successful cases and data presentation: the detailed project data and visual operation board are used to show the achievements in ultra-low emission of flue gas, up-to-standard reuse of leachate, collaborative disposal and digital operation and maintenance, embodying the reproducible path of win-win environmental and economic benefits.
Join hands to witness green energy
This trip to Shanghai is an important opportunity for Wuhan SY Blue Sky to deeply connect with the industry and seek common development. We deeply feel the market's urgent demand for efficient, green and intelligent environmental protection technologies, and we are more committed to leading the high-quality development of enterprises driven by innovation.
We invite you to visit K108 booth to experience technical demonstration and scheme exchange on site, and discuss the feasible path of "waste free city" construction and waste incineration power generation quality and efficiency improvement.
There is still the last day of the exhibition. We are looking forward to meeting with more like-minded partners in Shanghai for cooperation and win-win future.


Related News
Head Office Address: No. 1178, Gaoke Building, Jiayuan Road, Hongshan District, Wuhan, Hubei, China
WhatsApp/Mobile: +86-13801339781
Factory Address: No. 283 Zhongshan Avenue, Jinshan Street Office, Huangshi Economic Development Zone, Hubei, China