Iron and Steel Metallurgy Industry

Iron and Steel Metallurgy Industry

Our system deeply couples the DS combustion net heat recovery with the synergistic removal of multiple pollutants, allowing environmental protection facilities to reverse from a pure "capital consumption point" to a "cost reduction and efficiency improvement point"

Governance difficulties

The flue gas from steel kilns is generated in various smelting processes, with large emissions, high temperatures, complex compositions, containing metal dust, harmful gases, and waste heat resources. It is the main source of pollution in the steel industry.

Governance difficulties

Large emissions

The annual exhaust emissions of large enterprises can reach billions of cubic meters.

Large temperature fluctuations

The exhaust gas temperature can reach 800-1600 ℃, with significant differences between different processes.

High concentration of pollutants

Containing fine metal oxide smoke and dust, SO ₂ NOx、 Heavy metals, dioxins, and other harmful substances.

Unorganized emissions are high

The flue gas from processes such as iron tapping and slag tapping in blast furnaces is intermittent, and it is difficult to control the escape.

High value of resource utilization

High temperature waste gas, converter gas, and iron powder dust can all be recycled and reused.

Adapt to the high dust, high sulfur, and temperature fluctuation characteristics of sintering flue gas to achieve ultra-low emissions of multiple pollutants. Core process:

Gravity settling → rapid cooling heat exchange → high temperature dust removal → semi dry desulfurization → bag filter → hot blast furnace+GGH → SCR denitrification
Iron and Steel Metallurgy Industry

02

Preprocessing stage

Gravity settling+rapid cooling heat exchange, intercepting large particle dust, cooling to 180-280 ℃ to adapt to SCR reaction, reducing subsequent load.

02

High temperature dust removal stage

High temperature electrostatic precipitator removes over 90% of metal oxide dust, avoiding catalyst wear and blockage, and extending lifespan by 30%.

02

SCR denitration stage

Anti poisoning wide temperature catalyst reduces NOx at 180-280 ℃, with a denitrification rate of ≥ 90%, and is suitable for fluctuations in sintering conditions.

02

Semi dry desulfurization stage

Spray hydrated lime and SO ₂ reaction, desulfurization ≥ 95%, completely dry without wastewater, avoiding acid dew point corrosion.

02

Deep purification stage

Bag filter intercepts particulate matter and by-products, with a dust removal efficiency of ≥ 99.9%. It can be equipped with wet electrostatic precipitator to further remove dioxins and fine particulate matter, ensuring stable compliance.

Contact us immediately to learn more about the plan details

Contact Us

Governance difficulties

High temperature pre dust removal

Our proprietary high-temperature electrostatic precipitator is suitable for high dust conditions, avoiding catalyst blockage and wear, and increasing system lifespan by 30%

Wide temperature denitrification adaptation

Customized anti poisoning catalyst suitable for 180-280 ℃ wide window, no heating required, energy consumption reduced by more than 25%

Full process collaboration

Collaborative removal of multiple pollutants, synchronous removal of SO ₂ NOx、 Dioxins and heavy metals meet ultra-low emissions requirements

Efficient recovery of waste heat

Cascade utilization of thermal energy throughout the entire process, recovery of waste heat for heating production, synergistic efficiency reduction of pollution and carbon emissions

Related Core Products

Fabric Filter Equipment

Denitration Equipment

Desulfurization Equipment

Conveyor equipment

Automation Control

Application Cases

The SCR catalyst has high efficiency, with a denitrification efficiency of over 95%; After optimizing the process route, the system's power consumption is 10% -15% lower than the industry average level

Project Case

Project Case Studies

Project Case Studies

Project Case Studies

Project Case Studies

Project Case Studies

Project Case Studies

2x100 t/h Electric Furnace Dust Collection System

2x100 t/h Electric Furnace Dust Collection System

2x100 t/h Electric Furnace Dust Collection System

2x100 t/h Electric Furnace Dust Collection System

2x100 t/h Electric Furnace Dust Collection System

2x100 t/h Electric Furnace Dust Collection System

contact us

We are here for you!

Contact us

WhatsApp/Mobile: +86-13801339781

Email: fengsongtao@whsylt.com

Factory Address: No. 283 Zhongshan Avenue, Jinshan Street Office, Huangshi Economic Development Zone, Hubei, China

Head Office Address: No. 1178, Gaoke Building, Jiayuan Road, Hongshan District, Wuhan, Hubei, China

Welcome to leave an online message, we will contact you promptly

%{tishi_zhanwei}%